Hob Install

€100
Task Assigned

Description

New hob came but it's taller than the previous for the space because of a beam of wood in the cabinet below. The beam needs to be pared back to allow the new hob in.

Task Location: Killiney, Dublin
Due date: Any day of the week Monday 1 Dec to Sunday 7 Dec 2025
Date Posted: 1 Dec 2025
Posted by:
Assigned to:
Task Assigned: Comments are now closed
Thomas K. Made an offer 2 months ago
Paul M. 2 months ago

James that cable isn't recommended for a job, needs a thicker one. Was it pre wired?

Edward A. Made an offer 2 months ago
Edward A. Made an offer 2 months ago
Eoghan s. Made an offer 2 months ago
Giovanni I. Made an offer 2 months ago
Gabriel M. Made an offer 2 months ago
Marc W. Made an offer 2 months ago
James K. 2 months ago

@Eoghan s. That's right, just needs some extra space to drop down into so it's flush, all wiring done.

Eoghan s. 2 months ago

Hi James, am I correct in saying it’s all wired and everything and the counter doesn’t need to be cut it’s just that bit of cabinet lowered on the left side of the hole?