We use cookies to improve your site experience. Learn about our cookie usage.
You can accept or decline certain cookie useage cases from this form below:
You can find out more about the cookies we use in our Privacy policy.
Stripping and plumbing of new bathroom suite in an en-suite bathroom. New toilet, floor standing vanity unit, shower, shower door and radiator.
| Task Location: | Dublin |
| Due date: | Flexible |
| Date Posted: | 3 Nov 2025 |
| Posted by: | |
| Assigned to: |
Yes that's not a problem
@Richard B. Hi, are you available on the 2nd Dec to fit the new bathroom as I have a tiler for the 1st Dec? Also would you be available on the Sat before to take out the bathroom suite?
@Richard B. New shower tray as well.
Meant to ask you as well. Do you have a new shower tray or are you keeping the one you have
Thanks Lorraine
@Richard B. Hi, I’ll get back to you as soon as I have a tiler lined up for the job.
Ye that's not a problem
@Richard B. Would you be able to remove the old sanitary wear before the tiler starts and then come back to refit within a few days?
@Richard B. Hi, I could separate the plumbing and tiling. I have new sanitary wear and radiator. I might see if I can move the sink/ new vanity unit a bit to the right on the same wall but otherwise everything else will stay in the same position.
basically you looking someone to dismantle and renew you toilet with all materials and everithing supplied correct?