75 sqm area, screed with self levelling compound and then lay laminate floor. Kitchen and 2 bedrooms.
Task Location: | Rathleash, Co. Laois |
Due date: | Any day of the week Friday 4 Jul to Thursday 10 Jul 2025 |
Date Posted: | 4 Jul 2025 |
Posted by: | |
Assigned to: |
@Ciarán M. I can rip off rest of the floor and dispose myself, I am not doing it until I have confirmation on dates when the floor will be screeded
Have you got someone to strip the rest? And dispose of waste?
@Ciarán M. I have added photos, I have already removed existing floor and skirting boards of one of the bedrooms
@Ciarán M. Yes
Are all areas concrete base?
@Ciarán M. Some level of screeding will be needed to all the area, skirting boards will come out and can be fixed using nails after the floor laying is done
Is there any skirting boards or beading to be installed? And what size Is the area to be levelled?
@Ciarán M. I can buy levelling compound, I will around 6 bags at the moment, I will buy as per your suggestion.
Hi do you have levelling compound and all other materials ready to go?