Laminate flooring, around 75sqm.
Task Location: | Rathleash, Co. Laois |
Due date: | Flexible |
Date Posted: | 29 Jun 2025 |
Posted by: |
@Devin C. Can you do screeding
Hi, I can start 8th I will do the laminate floor but I can't do the screening
@Vaclav C. Before I accept: 1) you will screed the floor, this is to level the floor. 2) you will lay the laminate floor 3) you will start on 8th
@Devin C. Are you okay to lay self levelling compound? This is to level the floor
@Devin C. Hi Devin, there is no experience on your profile, you just completed 1 job. Could you please share more information
@Gence G. Thanks, let me sort out concrete, I am waiting for response from the guy who will do concrete on Friday. Your quote to lay floor is very high, I have quotes around 600. Please share details of jobs you did in the past. Thanks
@Gence G. I am expecting you to lay compounding material and then do the laminate flooring. That’s why I said you can’t do it in during the weekend. Please let me know both quotes, with or without compounding. I am talking to one guy who may do compounding on Friday. Whatever I chose you can’t finish job this weekend.
@Gence G. Hi dear, when you do compounding, you can’t finish job this weekend, compounding takes 2-4 days to dry. Please share your complete plan.
@Abramo D. I am wondering if you can come early to do compounding. Compounding will take 2-4 days to dry, you can lay floor when floor is dry.
@Gence G. When can you start? Is it today at 1pm?
@Vaclav C. When you are available?
I can start next week Tuesday 8th of July
@Vaclav C. When you can start
@James L. That’s okay
I'm afraid I have a tight window to get to this so with the additional work I wouldn't be able to fit it in, in July.
@James L. In patches, I feel screeding may be needed, I gave contract to a guy who didn’t finished the job due to some personal reasons, so these 2 rooms and kitchen is the left over job. According to him screed was needed.
Are the floors particularly bad?
@James L. So, screeding the floor is not included, you may have to do screeding with self levelling compound. Please confirm if your offer includes this as well.
@James L. I just posted 3 photos, for 1 bedroom I have already ripped off the floor and skirting boards, for other bedroom and kitchen floor has to be ripped off before installing new
If you can post a few pictures I'd be happy to give you a price. Its impossible to quote work like this accurately without seeing it. Thanks
@Abramo D. When can you start working? I am about to accept your offer
@James L. It is not new build, old floor (laminate) which I have removed from one of the rooms for other rooms, it has to be removed. I am installing 12mm laminate
I have skirting boards removed and old floor ripped off 1 bedroom, for other bedroom and kitchen old floor has to removed. I can remove myself if that is a hassle
Hi, can you provide some more detail please. Is this a new build? Is there old flooring to come up? What pattern/type of laminate are you using? Do you need skirting boards installed too? Can you post some pictures of the rooms to be floored.